Tear It Up

Ok, we have a rough plan and the sarassa comets are in thier temporary home, it’s time to tear it up.

Removing the old preformed pond was easy. Pump out the water and lift it out. Put an ad on craigslist.

Mark the hole with some stakes. Now the fun starts. Lets start digging, then dig somemore, after that we can do somemore digging. We need a hole a little larger than 8′ x 6′ and 2′ below grade.

 

The construction will be of 8′ 4 x 4′s. The filter and upper pond area does not need to be the full depth. Once the main pond area is built upĀ 3 courses, the filter area needs to be started.

The 4 x 4′s are nailed together with 9″ nails, cut from 3/8 rebar.

Leave a Reply

  

  

  

* Copy This Password *

* Type Or Paste Password Here *

20,710 Spam Comments Blocked so far by Spam Free Wordpress

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>