Moving Along Now

Finishing off the structure, the waterfall area is done and the intake to the bio-filter is framed in with 2 x 4″s, as well as the top of the filter area.

Great stuff expanding foam to fill gaps. Hardee board is glued and screwed into place.

The fish are still doing great, they really do enjoy a weekly 30 gallon water change.

You can also see the drains are all plumbed with valves. Eventually they will tie into a weeping pipe for the garden.

Leave a Reply

  

  

  

* Copy This Password *

* Type Or Paste Password Here *

20,710 Spam Comments Blocked so far by Spam Free Wordpress

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>